Skip to content

Our project required a bathymetric and utility survey, both of which required upland tie-ins for construction design. The site conditions were highly variable regarding water depth and active versus abandoned utilities and utility burial depths. Despite these challenges, the final survey report contained the information the contractor needed to determine sediment removal and turbidity containment means and methods. The survey and report were delivered under a tight timeframe and on budget, meeting our client’s objectives. Brennan is a reliable project partner.